NM Queue Project IA-PNM-2024-03 — Generation in Substation Otero County, New Mexico

NM Queue Project IA-PNM-2024-03 — Generation in Substation Otero County, New Mexico is a 150.0 MW generation interconnection project in Substation Otero County, New Mexico with a current status of withdrawn. It is proposed to connect at Alamogordo 115 kV Substation Otero County, NM Network Resource.

150.0 MWCapacity
WithdrawnStatus
NMMarket
GenerationTechnology

Project facts

Canonical nameNM Queue Project IA-PNM-2024-03 — Generation in Substation Otero County, New Mexico
Queue IDIA-PNM-2024-03
Statuswithdrawn
Source statusWithdrawn 3/25/25.
MarketNM
TechnologyGeneration
Capacity150.0 MW
StateNew Mexico
CountySubstation Otero County
Point of interconnectionAlamogordo 115 kV Substation Otero County, NM Network Resource
Requested (queue) date2024-06-26
Proposed in-service date
Operational date
Withdrawn date2025-03-25
Developer
Utility / transmission ownerPublic Service Company of New Mexico

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pnm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata