NM Queue Project SRP Q03 — Wind in an unlisted county, New Mexico
NM Queue Project SRP Q03 — Wind in an unlisted county, New Mexico is a 700.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at Coronado 500 kV.
700.0 MWCapacity
WithdrawnStatus
NMMarket
WindTechnology
Project facts
| Canonical name | NM Queue Project SRP Q03 — Wind in an unlisted county, New Mexico |
|---|---|
| Queue ID | SRP Q03 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | NM |
| Technology | Wind |
| Capacity | 700.0 MW |
| State | New Mexico |
| County | — |
| Point of interconnection | Coronado 500 kV |
| Requested (queue) date | 2008-07-14 |
| Proposed in-service date | 2015-06-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Salt River Project |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: srp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata