NM Tularosa Solar Project (Lincoln Renewable Energy LLC) (38)

NM Tularosa Solar Project (Lincoln Renewable Energy LLC) is a 20.0 MW solar interconnection project in Otero, New Mexico with a current status of withdrawn. It is proposed to connect at Tap the 115 kV line that connects to Holloman Substataion.

20.0 MWCapacity
WithdrawnStatus
WestMarket
SolarTechnology

Project facts

Canonical nameNM Tularosa Solar Project (Lincoln Renewable Energy LLC)
Queue ID38
Statuswithdrawn
Source statuswithdrawn
MarketWest
TechnologySolar
Capacity20.0 MW
StateNew Mexico
CountyOtero
Point of interconnectionTap the 115 kV line that connects to Holloman Substataion
Requested (queue) date2012-05-15
Proposed in-service date2014-06-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerEl Paso Electric Company

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata