Nordic 138kV Substation (J2316)

Nordic 138kV Substation is a 77.5 MW solar interconnection project in Dickinson, Michigan with a current status of operational. It is proposed to connect at Nordic 138kV Substation.

77.5 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameNordic 138kV Substation
Queue IDJ2316
Statusoperational
Source statusActive
Market
TechnologySolar
Capacity77.5 MW
StateMichigan
CountyDickinson
Point of interconnectionNordic 138kV Substation
Requested (queue) date2021-09-16
Proposed in-service date2023-09-15
Operational date2023-09-15
Withdrawn date
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.