North Beaver Dam 69kV Substation (J1345)

North Beaver Dam 69kV Substation is a 25.0 MW battery interconnection project in Dodge County, Wisconsin with a current status of withdrawn. It is proposed to connect at North Beaver Dam 69kV Substation.

25.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameNorth Beaver Dam 69kV Substation
Queue IDJ1345
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity25.0 MW
StateWisconsin
CountyDodge County
Point of interconnectionNorth Beaver Dam 69kV Substation
Requested (queue) date2019-04-29
Proposed in-service date2021-10-01
Operational date2021-10-01
Withdrawn date2022-03-08
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.