North Eddy - Chaves 230kV line (GEN-2022-033)

North Eddy - Chaves 230kV line is a 200.0 MW solar interconnection project in Chaves, New Mexico with a current status of withdrawn. It is proposed to connect at North Eddy - Chaves 230kV line.

200.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameNorth Eddy - Chaves 230kV line
Queue IDGEN-2022-033
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity200.0 MW
StateNew Mexico
CountyChaves
Point of interconnectionNorth Eddy - Chaves 230kV line
Requested (queue) date2022-06-23
Proposed in-service date2025-12-01
Operational date
Withdrawn date2023-11-28
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata