North Fort Dodge 115kV (GEN-2010-037)

North Fort Dodge 115kV is a 100.8 MW wind interconnection project in Ford County, Kansas with a current status of withdrawn. It is proposed to connect at North Fort Dodge 115kV.

100.8 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameNorth Fort Dodge 115kV
Queue IDGEN-2010-037
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity100.8 MW
StateKansas
CountyFord County
Point of interconnectionNorth Fort Dodge 115kV
Requested (queue) date2010-07-15
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSUNC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata