North Lake 138 kV Substation (J879)

North Lake 138 kV Substation is a 70.0 MW wind interconnection project in Baraga County, Michigan with a current status of withdrawn. It is proposed to connect at North Lake 138 kV Substation.

70.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameNorth Lake 138 kV Substation
Queue IDJ879
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity70.0 MW
StateMichigan
CountyBaraga County
Point of interconnectionNorth Lake 138 kV Substation
Requested (queue) date2017-06-16
Proposed in-service date2020-09-23
Operational date2020-09-23
Withdrawn date2018-05-11
Developer
Utility / transmission ownerAMERICAN TRANSMISSION COMPANY

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.