North Richland is a 40.0 MW other interconnection project in Benton, Washington with a current status of withdrawn. It is proposed to connect at White Bluffs-Stevens Drive No 2 115kV line.
40.0 MWCapacity
WithdrawnStatus
WAMarket
OtherTechnology
Project facts
| Canonical name | North Richland |
|---|---|
| Queue ID | L0532 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | WA |
| Technology | Other |
| Capacity | 40.0 MW |
| State | Washington |
| County | Benton |
| Point of interconnection | White Bluffs-Stevens Drive No 2 115kV line |
| Requested (queue) date | 2022-07-14 |
| Proposed in-service date | 2025-07-11 |
| Operational date | — |
| Withdrawn date | — |
| Developer | City of Richland, Washington |
| Utility / transmission owner | Bonneville Power Administration |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata