Northeast-CP Crane 115kV (AH2-162)

Northeast-CP Crane 115kV is a 200.0 MW battery interconnection project in Baltimore County, Maryland with a current status of withdrawn.

200.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameNortheast-CP Crane 115kV
Queue IDAH2-162
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity200.0 MW
StateMaryland
CountyBaltimore County
Point of interconnection
Requested (queue) date2022-03-04
Proposed in-service date2026-03-01
Operational date
Withdrawn date2025-08-06
Developer
Utility / transmission ownerBGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata