Northeast-CP Crane 115kV (AI1-130)

Northeast-CP Crane 115kV is a 75.0 MW battery interconnection project in Baltimore County, Maryland with a current status of withdrawn.

75.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameNortheast-CP Crane 115kV
Queue IDAI1-130
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity75.0 MW
StateMaryland
CountyBaltimore County
Point of interconnection
Requested (queue) date2022-09-09
Proposed in-service date2026-09-07
Operational date
Withdrawn date
Developer
Utility / transmission ownerBGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata