Northeast (MI) (1734_5)

Northeast (MI) is a 23.4 MW gas interconnection project in Macomb, Michigan with a current status of operational.

23.4 MWCapacity
OperationalStatus
MISOMarket
GasTechnology

Project facts

Canonical nameNortheast (MI)
Queue ID1734_5
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyGas
Capacity23.4 MW
StateMichigan
CountyMacomb
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1971-06-01
Withdrawn date
Developer
Utility / transmission ownerDTE Electric Company

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata