Northeast - Riverside 230 kV (AH1-261 - moved to TC2)

Northeast - Riverside 230 kV is a 135.0 MW battery interconnection project in Baltimore County, Maryland with a current status of withdrawn.

135.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameNortheast - Riverside 230 kV
Queue IDAH1-261 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity135.0 MW
StateMaryland
CountyBaltimore County
Point of interconnection—
Requested (queue) date2021-09-10
Proposed in-service date2028-12-01
Operational date—
Withdrawn date2026-09-30
Developer—
Utility / transmission ownerBGE

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-01statusactivewithdrawnhigh
2026-10-01withdrawn_date—2026-09-30high
2026-10-01proposed_online_date—2028-12-01medium
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.