Novo BioPower Plant (56616_G3)

Novo BioPower Plant is a 27.2 MW other interconnection project in Navajo, Arizona with a current status of operational.

27.2 MWCapacity
OperationalStatus
AZPSMarket
OtherTechnology

Project facts

Canonical nameNovo BioPower Plant
Queue ID56616_G3
Statusoperational
Source status(OP) Operating
MarketAZPS
TechnologyOther
Capacity27.2 MW
StateArizona
CountyNavajo
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2008-06-01
Withdrawn date
Developer
Utility / transmission ownerNovo Biopower LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata