Number Nine Wind CNR only (Q417) (653)

Number Nine Wind CNR only (Q417) is a 250.0 MW wind interconnection project in Aroostook, Maine with a current status of withdrawn. It is proposed to connect at Pittsfield 345KV.

250.0 MWCapacity
WithdrawnStatus
BHEMarket
WindTechnology

Project facts

Canonical nameNumber Nine Wind CNR only (Q417)
Queue ID653
Statuswithdrawn
Source statusW
MarketBHE
TechnologyWind
Capacity250.0 MW
StateMaine
CountyAroostook
Point of interconnectionPittsfield 345KV
Requested (queue) date2017-06-09
Proposed in-service date2021-10-31
Operational date
Withdrawn date2019-05-13
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata