NV Queue Project 25-00395 — Solar+Battery in Washoe, Nevada

NV Queue Project 25-00395 — Solar+Battery in Washoe, Nevada is a 600.0 MW solar+battery interconnection project in Washoe, Nevada with a current status of active. It is proposed to connect at Granite 500Kv.

600.0 MWCapacity
ActiveStatus
NVMarket
Solar+BatteryTechnology

Project facts

Canonical nameNV Queue Project 25-00395 — Solar+Battery in Washoe, Nevada
Queue ID25-00395
Statusactive
Source statusIn Study
MarketNV
TechnologySolar+Battery
Capacity600.0 MW
StateNevada
CountyWashoe
Point of interconnectionGranite 500Kv
Requested (queue) date2025-07-30
Proposed in-service date2028-03-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.