NV Queue Project 25-00431 — Battery in Storey, Nevada

NV Queue Project 25-00431 — Battery in Storey, Nevada is a 250.0 MW battery interconnection project in Storey, Nevada with a current status of withdrawn. It is proposed to connect at Meadow 120 kV.

250.0 MWCapacity
WithdrawnStatus
NVMarket
BatteryTechnology

Project facts

Canonical nameNV Queue Project 25-00431 — Battery in Storey, Nevada
Queue ID25-00431
Statuswithdrawn
Source statusWithdrawn
MarketNV
TechnologyBattery
Capacity250.0 MW
StateNevada
CountyStorey
Point of interconnectionMeadow 120 kV
Requested (queue) date2025-07-30
Proposed in-service date2029-08-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-11-16statusactivewithdrawnhigh
2026-10-19phaseNoYeslow
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata