NV Queue Project 25N-SG7 — Other in Nye, Nevada
NV Queue Project 25N-SG7 — Other in Nye, Nevada is a 16.0 MW other interconnection project in Nye, Nevada with a current status of withdrawn. It is proposed to connect at Round Mountain #222.
16.0 MWCapacity
WithdrawnStatus
NVMarket
OtherTechnology
Project facts
| Canonical name | NV Queue Project 25N-SG7 — Other in Nye, Nevada |
|---|---|
| Queue ID | 25N-SG7 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | NV |
| Technology | Other |
| Capacity | 16.0 MW |
| State | Nevada |
| County | Nye |
| Point of interconnection | Round Mountain #222 |
| Requested (queue) date | 2025-10-07 |
| Proposed in-service date | 2029-04-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NV Energy (Nevada Power / Sierra Pacific Power) |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata