NV Queue Project 26-00445 — Solar+Battery in Lander, Nevada

NV Queue Project 26-00445 — Solar+Battery in Lander, Nevada is a 600.0 MW solar+battery interconnection project in Lander, Nevada with a current status of active. It is proposed to connect at Lander 230 kV.

600.0 MWCapacity
ActiveStatus
NVMarket
Solar+BatteryTechnology

Project facts

Canonical nameNV Queue Project 26-00445 — Solar+Battery in Lander, Nevada
Queue ID26-00445
Statusactive
Source statusIn Study
MarketNV
TechnologySolar+Battery
Capacity600.0 MW
StateNevada
CountyLander
Point of interconnectionLander 230 kV
Requested (queue) date2026-07-30
Proposed in-service date2031-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata