NV Queue Project 26-00470 — Other in Lander, Nevada is a 199.0 MW other interconnection project in Lander, Nevada with a current status of active. It is proposed to connect at Shoshone 345kV.

199.0 MWCapacity
ActiveStatus
NVMarket
OtherTechnology

Project facts

Canonical nameNV Queue Project 26-00470 — Other in Lander, Nevada
Queue ID26-00470
Statusactive
Source statusIn Study
MarketNV
TechnologyOther
Capacity199.0 MW
StateNevada
CountyLander
Point of interconnectionShoshone 345kV
Requested (queue) date2026-07-30
Proposed in-service date2031-04-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-10new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.