NV Queue Project Company FU — Generation in Lander, Nevada

NV Queue Project Company FU — Generation in Lander, Nevada is a 38.5 MW generation interconnection project in Lander, Nevada with a current status of withdrawn. It is proposed to connect at Ft. Churchill - Gonder 230 kV Line.

38.5 MWCapacity
WithdrawnStatus
NVMarket
GenerationTechnology

Project facts

Canonical nameNV Queue Project Company FU — Generation in Lander, Nevada
Queue IDCompany FU
Statuswithdrawn
Source statusWithdrawn
MarketNV
TechnologyGeneration
Capacity38.5 MW
StateNevada
CountyLander
Point of interconnectionFt. Churchill - Gonder 230 kV Line
Requested (queue) date2013-09-18
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-28proposed_online_date2015-03-02—medium
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-10-05
Data last materially changed2026-10-05
Page data generated2026-10-11

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.