NV Queue Project Company GU — Solar+Battery in Washoe, Nevada

NV Queue Project Company GU — Solar+Battery in Washoe, Nevada is a 200.0 MW solar+battery interconnection project in Washoe, Nevada with a current status of operational. It is proposed to connect at Valmy - Tracy #3421 345 kV.

200.0 MWCapacity
OperationalStatus
NVMarket
Solar+BatteryTechnology

Project facts

Canonical nameNV Queue Project Company GU — Solar+Battery in Washoe, Nevada
Queue IDCompany GU
Statusoperational
Source statusExecuted - In Service
MarketNV
TechnologySolar+Battery
Capacity200.0 MW
StateNevada
CountyWashoe
Point of interconnectionValmy - Tracy #3421 345 kV
Requested (queue) date2015-09-29
Proposed in-service date
Operational date2021-12-16
Withdrawn date
Developer
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata