NV Queue Project Company HI — Solar in Nye, Nevada

NV Queue Project Company HI — Solar in Nye, Nevada is a 100.0 MW solar interconnection project in Nye, Nevada with a current status of withdrawn. It is proposed to connect at Anaconda Moly 120 kV.

100.0 MWCapacity
WithdrawnStatus
NVMarket
SolarTechnology

Project facts

Canonical nameNV Queue Project Company HI — Solar in Nye, Nevada
Queue IDCompany HI
Statuswithdrawn
Source statusWithdrawn
MarketNV
TechnologySolar
Capacity100.0 MW
StateNevada
CountyNye
Point of interconnectionAnaconda Moly 120 kV
Requested (queue) date2016-09-22
Proposed in-service date2018-09-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata