NV Queue Project Company HW — Other in Esmerelda, Nevada

NV Queue Project Company HW — Other in Esmerelda, Nevada is a 38.5 MW other interconnection project in Esmerelda, Nevada with a current status of withdrawn. It is proposed to connect at Millers 120 kV.

38.5 MWCapacity
WithdrawnStatus
NVMarket
OtherTechnology

Project facts

Canonical nameNV Queue Project Company HW — Other in Esmerelda, Nevada
Queue IDCompany HW
Statuswithdrawn
Source statusWithdrawn
MarketNV
TechnologyOther
Capacity38.5 MW
StateNevada
CountyEsmerelda
Point of interconnectionMillers 120 kV
Requested (queue) date2017-09-28
Proposed in-service date2020-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata