NV Queue Project Company JW — Battery in Washoe, Nevada

NV Queue Project Company JW — Battery in Washoe, Nevada is a 100.0 MW battery interconnection project in Washoe, Nevada with a current status of active. It is proposed to connect at Mira Loma 120 kV.

100.0 MWCapacity
ActiveStatus
NVMarket
BatteryTechnology

Project facts

Canonical nameNV Queue Project Company JW — Battery in Washoe, Nevada
Queue IDCompany JW
Statusactive
Source statusExecuted
MarketNV
TechnologyBattery
Capacity100.0 MW
StateNevada
CountyWashoe
Point of interconnectionMira Loma 120 kV
Requested (queue) date2019-09-23
Proposed in-service date2027-03-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectactivehigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata