NV Queue Project Company KA — Solar+Battery in Mineral, Nevada is a 100.0 MW solar+battery interconnection project in Mineral, Nevada with a current status of withdrawn. It is proposed to connect at Thorne - Ft. Churchill 120 kV.
100.0 MWCapacity
WithdrawnStatus
NVMarket
Solar+BatteryTechnology
Project facts
| Canonical name | NV Queue Project Company KA — Solar+Battery in Mineral, Nevada |
|---|---|
| Queue ID | Company KA |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | NV |
| Technology | Solar+Battery |
| Capacity | 100.0 MW |
| State | Nevada |
| County | Mineral |
| Point of interconnection | Thorne - Ft. Churchill 120 kV |
| Requested (queue) date | 2019-09-25 |
| Proposed in-service date | 2022-11-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NV Energy (Nevada Power / Sierra Pacific Power) |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.