NV Queue Project Company KC — Battery in Storey, Nevada

NV Queue Project Company KC — Battery in Storey, Nevada is a 300.0 MW battery interconnection project in Storey, Nevada with a current status of withdrawn. It is proposed to connect at West Tracy 345 kV.

300.0 MWCapacity
WithdrawnStatus
NVMarket
BatteryTechnology

Project facts

Canonical nameNV Queue Project Company KC — Battery in Storey, Nevada
Queue IDCompany KC
Statuswithdrawn
Source statusWithdrawn
MarketNV
TechnologyBattery
Capacity300.0 MW
StateNevada
CountyStorey
Point of interconnectionWest Tracy 345 kV
Requested (queue) date2019-09-27
Proposed in-service date2022-11-30
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata