NV Queue Project Company KS — Wind in White Pine, Nevada

NV Queue Project Company KS — Wind in White Pine, Nevada is a 575.0 MW wind interconnection project in White Pine, Nevada with a current status of withdrawn. It is proposed to connect at Robinson 500 kV.

575.0 MWCapacity
WithdrawnStatus
NVMarket
WindTechnology

Project facts

Canonical nameNV Queue Project Company KS — Wind in White Pine, Nevada
Queue IDCompany KS
Statuswithdrawn
Source statusWithdrawn
MarketNV
TechnologyWind
Capacity575.0 MW
StateNevada
CountyWhite Pine
Point of interconnectionRobinson 500 kV
Requested (queue) date2020-09-23
Proposed in-service date2024-09-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—withdrawnhigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata