NV Queue Project Company LV — Wind in White Pine, Nevada

NV Queue Project Company LV — Wind in White Pine, Nevada is a 600.0 MW wind interconnection project in White Pine, Nevada with a current status of suspended. It is proposed to connect at Robinson Summit 525kV.

600.0 MWCapacity
SuspendedStatus
NVMarket
WindTechnology

Project facts

Canonical nameNV Queue Project Company LV — Wind in White Pine, Nevada
Queue IDCompany LV
Statussuspended
Source statusExecuted - Suspended
MarketNV
TechnologyWind
Capacity600.0 MW
StateNevada
CountyWhite Pine
Point of interconnectionRobinson Summit 525kV
Requested (queue) date2021-09-28
Proposed in-service date2025-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectsuspendedhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata