NV Queue Project Company MM — Other in Esmeralda, Nevada

NV Queue Project Company MM — Other in Esmeralda, Nevada is a 19.8 MW other interconnection project in Esmeralda, Nevada with a current status of active. It is proposed to connect at Silver Peak 57.5 kV.

19.8 MWCapacity
ActiveStatus
NVMarket
OtherTechnology

Project facts

Canonical nameNV Queue Project Company MM — Other in Esmeralda, Nevada
Queue IDCompany MM
Statusactive
Source statusExecuted
MarketNV
TechnologyOther
Capacity19.8 MW
StateNevada
CountyEsmeralda
Point of interconnectionSilver Peak 57.5 kV
Requested (queue) date2021-12-08
Proposed in-service date2025-10-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata