NV Queue Project Company MW — Solar+Battery in White Pine, Nevada

NV Queue Project Company MW — Solar+Battery in White Pine, Nevada is a 400.0 MW solar+battery interconnection project in White Pine, Nevada with a current status of suspended. It is proposed to connect at Robinson Summit 500 kV.

400.0 MWCapacity
SuspendedStatus
NVMarket
Solar+BatteryTechnology

Project facts

Canonical nameNV Queue Project Company MW — Solar+Battery in White Pine, Nevada
Queue IDCompany MW
Statussuspended
Source statusExecuted - Suspended
MarketNV
TechnologySolar+Battery
Capacity400.0 MW
StateNevada
CountyWhite Pine
Point of interconnectionRobinson Summit 500 kV
Requested (queue) date2022-03-28
Proposed in-service date2030-12-31
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-09-28statusactivesuspendedhigh
2026-08-03new_project—activehigh

Explore related data

Source last checked2026-11-23
Data last materially changed2026-11-23
Page data generated2026-11-26

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata