NV Queue Project Company MZ — Wind in Elko, Nevada

NV Queue Project Company MZ — Wind in Elko, Nevada is a 220.0 MW wind interconnection project in Elko, Nevada with a current status of withdrawn. It is proposed to connect at Humbolt - Midpoint 345 kV.

220.0 MWCapacity
WithdrawnStatus
NVMarket
WindTechnology

Project facts

Canonical nameNV Queue Project Company MZ — Wind in Elko, Nevada
Queue IDCompany MZ
Statuswithdrawn
Source statusWithdrawn
MarketNV
TechnologyWind
Capacity220.0 MW
StateNevada
CountyElko
Point of interconnectionHumbolt - Midpoint 345 kV
Requested (queue) date2022-03-28
Proposed in-service date2026-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.