NV Queue Project Company NH — Battery in Washoe, Nevada

NV Queue Project Company NH — Battery in Washoe, Nevada is a 100.0 MW battery interconnection project in Washoe, Nevada with a current status of suspended. It is proposed to connect at North Red Rock 120 kV.

100.0 MWCapacity
SuspendedStatus
NVMarket
BatteryTechnology

Project facts

Canonical nameNV Queue Project Company NH — Battery in Washoe, Nevada
Queue IDCompany NH
Statussuspended
Source statusExecuted - Suspended
MarketNV
TechnologyBattery
Capacity100.0 MW
StateNevada
CountyWashoe
Point of interconnectionNorth Red Rock 120 kV
Requested (queue) date2022-03-29
Proposed in-service date2024-04-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerNV Energy (Nevada Power / Sierra Pacific Power)

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectsuspendedhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata