NV Queue Project Company NZ — Battery in Storey, Nevada
NV Queue Project Company NZ — Battery in Storey, Nevada is a 250.0 MW battery interconnection project in Storey, Nevada with a current status of suspended. It is proposed to connect at Dove 120 kV.
250.0 MWCapacity
SuspendedStatus
NVMarket
BatteryTechnology
Project facts
| Canonical name | NV Queue Project Company NZ — Battery in Storey, Nevada |
|---|---|
| Queue ID | Company NZ |
| Status | suspended |
| Source status | Executed - Suspended |
| Market | NV |
| Technology | Battery |
| Capacity | 250.0 MW |
| State | Nevada |
| County | Storey |
| Point of interconnection | Dove 120 kV |
| Requested (queue) date | 2022-09-28 |
| Proposed in-service date | 2030-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | NV Energy (Nevada Power / Sierra Pacific Power) |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | suspended | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: nvenergy-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata