NY Lancaster Gunnville Rd Site 1 Solar C (66528_18237)

NY Lancaster Gunnville Rd Site 1 Solar C is a 5.0 MW solar interconnection project in Erie, New York with a current status of operational.

5.0 MWCapacity
OperationalStatus
NYISMarket
SolarTechnology

Project facts

Canonical nameNY Lancaster Gunnville Rd Site 1 Solar C
Queue ID66528_18237
Statusoperational
Source status(OP) Operating
MarketNYIS
TechnologySolar
Capacity5.0 MW
StateNew York
CountyErie
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2024-02-01
Withdrawn date—
Developer—
Utility / transmission ownerAC Power 14, LLC

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-11-01
Data last materially changed2026-11-01
Page data generated2026-11-26

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.