Oak Point Yard (0016)

Oak Point Yard is a 500.0 MW gas interconnection project in Bronx, New York with a current status of withdrawn. It is proposed to connect at Hell Gate/Bruckner 138kV.

500.0 MWCapacity
WithdrawnStatus
JMarket
GasTechnology

Project facts

Canonical nameOak Point Yard
Queue ID0016
Statuswithdrawn
Source status0
MarketJ
TechnologyGas
Capacity500.0 MW
StateNew York
CountyBronx
Point of interconnectionHell Gate/Bruckner 138kV
Requested (queue) date1999-04-15
Proposed in-service date2008-07-10
Operational date
Withdrawn date
DeveloperOak Point Property, LLC
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata