OAK RIDGE (LA) - STERLINGTON 115 SWYD 115.0kV (J3603)

OAK RIDGE (LA) - STERLINGTON 115 SWYD 115.0kV is a 175.0 MW solar interconnection project in Morehouse, Louisiana with a current status of withdrawn. It is proposed to connect at OAK RIDGE (LA) - STERLINGTON 115 SWYD 115.0kV.

175.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameOAK RIDGE (LA) - STERLINGTON 115 SWYD 115.0kV
Queue IDJ3603
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity175.0 MW
StateLouisiana
CountyMorehouse
Point of interconnectionOAK RIDGE (LA) - STERLINGTON 115 SWYD 115.0kV
Requested (queue) date2024-04-16
Proposed in-service date2028-09-15
Operational date2028-09-15
Withdrawn date2025-12-23
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata