Oasis 230kV Substation (ERAS-2025-018)
Oasis 230kV Substation is a 256.0 MW solar interconnection project in Portales, New Mexico with a current status of operational. It is proposed to connect at Oasis 230kV Substation.
256.0 MWCapacity
OperationalStatus
NMMarket
SolarTechnology
Project facts
| Canonical name | Oasis 230kV Substation |
|---|---|
| Queue ID | ERAS-2025-018 |
| Status | operational |
| Source status | ERAS |
| Market | NM |
| Technology | Solar |
| Capacity | 256.0 MW |
| State | New Mexico |
| County | Portales |
| Point of interconnection | Oasis 230kV Substation |
| Requested (queue) date | 2025-10-02 |
| Proposed in-service date | — |
| Operational date | 2029-11-21 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | SPS |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata