Oasis 230kV Substation (ERAS-2025-018)

Oasis 230kV Substation is a 256.0 MW solar interconnection project in Portales, New Mexico with a current status of operational. It is proposed to connect at Oasis 230kV Substation.

256.0 MWCapacity
OperationalStatus
NMMarket
SolarTechnology

Project facts

Canonical nameOasis 230kV Substation
Queue IDERAS-2025-018
Statusoperational
Source statusERAS
MarketNM
TechnologySolar
Capacity256.0 MW
StateNew Mexico
CountyPortales
Point of interconnectionOasis 230kV Substation
Requested (queue) date2025-10-02
Proposed in-service date
Operational date2029-11-21
Withdrawn date
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata