Obrien County - Kossuth 345 kV Line Tap (J982)

Obrien County - Kossuth 345 kV Line Tap is a 300.0 MW wind interconnection project in Dickinson County,Emmet County, Iowa with a current status of operational. It is proposed to connect at Obrien County - Kossuth 345 kV Line Tap.

300.0 MWCapacity
OperationalStatus
Market
WindTechnology

Project facts

Canonical nameObrien County - Kossuth 345 kV Line Tap
Queue IDJ982
Statusoperational
Source statusDone
Market
TechnologyWind
Capacity300.0 MW
StateIowa
CountyDickinson County,Emmet County
Point of interconnectionObrien County - Kossuth 345 kV Line Tap
Requested (queue) date2018-03-12
Proposed in-service date2021-06-01
Operational date2021-06-01
Withdrawn date
Developer
Utility / transmission ownerMIDAMERICAN ENERGY CO.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata