OK Queue Project GI-108 — Solar+Battery in Craig County, Oklahoma
OK Queue Project GI-108 — Solar+Battery in Craig County, Oklahoma is a 250.0 MW solar+battery interconnection project in Craig County, Oklahoma with a current status of withdrawn. It is proposed to connect at Sportsman-Blackberry 345 kV line.
250.0 MWCapacity
WithdrawnStatus
OKMarket
Solar+BatteryTechnology
Project facts
| Canonical name | OK Queue Project GI-108 — Solar+Battery in Craig County, Oklahoma |
|---|---|
| Queue ID | GI-108 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | OK |
| Technology | Solar+Battery |
| Capacity | 250.0 MW |
| State | Oklahoma |
| County | Craig County |
| Point of interconnection | Sportsman-Blackberry 345 kV line |
| Requested (queue) date | 2022-08-30 |
| Proposed in-service date | 2025-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Associated Electric Cooperative, Inc. |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: aeci-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata