OK Queue Project GI-29 — Wind in Osage County, Oklahoma
OK Queue Project GI-29 — Wind in Osage County, Oklahoma is a 200.0 MW wind interconnection project in Osage County, Oklahoma with a current status of withdrawn. It is proposed to connect at New substation on the Shidler to Osage 138 kV line near the Fairfax Tap..
200.0 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology
Project facts
| Canonical name | OK Queue Project GI-29 — Wind in Osage County, Oklahoma |
|---|---|
| Queue ID | GI-29 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | OK |
| Technology | Wind |
| Capacity | 200.0 MW |
| State | Oklahoma |
| County | Osage County |
| Point of interconnection | New substation on the Shidler to Osage 138 kV line near the Fairfax Tap. |
| Requested (queue) date | 2008-05-13 |
| Proposed in-service date | 2011-12-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Associated Electric Cooperative, Inc. |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: aeci-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata