OK Queue Project GI-96 — Wind in Lincoln County, Oklahoma

OK Queue Project GI-96 — Wind in Lincoln County, Oklahoma is a 97.5 MW wind interconnection project in Lincoln County, Oklahoma with a current status of withdrawn. It is proposed to connect at Stroud 138kV.

97.5 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameOK Queue Project GI-96 — Wind in Lincoln County, Oklahoma
Queue IDGI-96
Statuswithdrawn
Source statusWithdrawn
MarketOK
TechnologyWind
Capacity97.5 MW
StateOklahoma
CountyLincoln County
Point of interconnectionStroud 138kV
Requested (queue) date2021-10-22
Proposed in-service date2026-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerAssociated Electric Cooperative, Inc.

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: aeci-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata