OKGE Sooner 345kV line (GEN-2021-071)

OKGE Sooner 345kV line is a 403.2 MW wind interconnection project in Noble, Oklahoma with a current status of withdrawn. It is proposed to connect at OKGE Sooner 345kV line.

403.2 MWCapacity
WithdrawnStatus
OKMarket
WindTechnology

Project facts

Canonical nameOKGE Sooner 345kV line
Queue IDGEN-2021-071
Statuswithdrawn
Source statusWITHDRAWN
MarketOK
TechnologyWind
Capacity403.2 MW
StateOklahoma
CountyNoble
Point of interconnectionOKGE Sooner 345kV line
Requested (queue) date2021-04-26
Proposed in-service date2027-11-01
Operational date
Withdrawn date2023-07-17
Developer
Utility / transmission ownerOGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.