Oneida 138 kV Substation (J1178)

Oneida 138 kV Substation is a 65.0 MW solar interconnection project in Eaton County, Michigan with a current status of withdrawn. It is proposed to connect at Oneida 138 kV Substation.

65.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameOneida 138 kV Substation
Queue IDJ1178
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity65.0 MW
StateMichigan
CountyEaton County
Point of interconnectionOneida 138 kV Substation
Requested (queue) date2018-03-12
Proposed in-service date2020-07-01
Operational date2020-07-01
Withdrawn date2021-08-06
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.