Oneida 138kV Substation (J1192)

Oneida 138kV Substation is a 35.0 MW solar interconnection project in Eaton County, Michigan with a current status of withdrawn. It is proposed to connect at Oneida 138kV Substation.

35.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameOneida 138kV Substation
Queue IDJ1192
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity35.0 MW
StateMichigan
CountyEaton County
Point of interconnectionOneida 138kV Substation
Requested (queue) date2019-03-25
Proposed in-service date2021-07-01
Operational date2021-07-01
Withdrawn date2022-10-25
Developer
Utility / transmission ownerMETC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.