Oneida (829_2)

Oneida is a 10.0 MW other interconnection project in Franklin, Idaho with a current status of operational.

10.0 MWCapacity
OperationalStatus
PACEMarket
OtherTechnology

Project facts

Canonical nameOneida
Queue ID829_2
Statusoperational
Source status(OP) Operating
MarketPACE
TechnologyOther
Capacity10.0 MW
StateIdaho
CountyFranklin
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date1916-07-01
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata