Opal Storage Project (1306)

Opal Storage Project is a 200.0 MW battery interconnection project in Orange, New York with a current status of withdrawn. It is proposed to connect at East Walden 115 kV substation.

200.0 MWCapacity
WithdrawnStatus
GMarket
BatteryTechnology

Project facts

Canonical nameOpal Storage Project
Queue ID1306
Statuswithdrawn
Source status0
MarketG
TechnologyBattery
Capacity200.0 MW
StateNew York
CountyOrange
Point of interconnectionEast Walden 115 kV substation
Requested (queue) date2021-11-12
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperHanwha Q CELLS USA
Utility / transmission ownerCHG&E

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata