Orange & Rockland DG CDG-00449 (CDG-00449)

Orange & Rockland DG CDG-00449 is a 5.0 MW solar interconnection project in Orange, New York with a current status of operational. It is proposed to connect at Chester 138KV / 63-7-13.

5.0 MWCapacity
OperationalStatus
ChesterMarket
SolarTechnology

Project facts

Canonical nameOrange & Rockland DG CDG-00449
Queue IDCDG-00449
Statusoperational
Source statusInterconnected
MarketChester
TechnologySolar
Capacity5.0 MW
StateNew York
CountyOrange
Point of interconnectionChester 138KV / 63-7-13
Requested (queue) date
Proposed in-service date
Operational date2025-12-31
Withdrawn date
Developer
Utility / transmission ownerOrange & Rockland

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-05new_projectoperationalhigh

Explore related data

Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27

Provenance: ny-dg-solar. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata