Orange & Rockland Storage CDG-00387 (CDG-00387)
Orange & Rockland Storage CDG-00387 is a 1.4 MW battery interconnection project in Orange, New York with a current status of operational. It is proposed to connect at Westtown / 103-1-13.
1.4 MWCapacity
OperationalStatus
New HamptonMarket
BatteryTechnology
Project facts
| Canonical name | Orange & Rockland Storage CDG-00387 |
|---|---|
| Queue ID | CDG-00387 |
| Status | operational |
| Source status | Interconnected |
| Market | New Hampton |
| Technology | Battery |
| Capacity | 1.4 MW |
| State | New York |
| County | Orange |
| Point of interconnection | Westtown / 103-1-13 |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2022-12-31 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Orange & Rockland |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-05 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-05
Data last materially changed2026-08-05
Page data generated2026-08-27
Provenance: ny-storage. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata