Orchard BESS (1572)

Orchard BESS is a 80.0 MW battery interconnection project in Ulster County, New York with a current status of withdrawn. It is proposed to connect at 115 kV Modena Substation.

80.0 MWCapacity
WithdrawnStatus
GMarket
BatteryTechnology

Project facts

Canonical nameOrchard BESS
Queue ID1572
Statuswithdrawn
Source status0
MarketG
TechnologyBattery
Capacity80.0 MW
StateNew York
CountyUlster County
Point of interconnection115 kV Modena Substation
Requested (queue) date2023-06-23
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperEmpire Reserve Energy, LLC
Utility / transmission ownerCHGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata